Saturday, December 18, 2010

Update




It's been over two years since I've posted to this blog. The reality is, in October of 2008 I accepted an assignment as Engineering Manager for a large petrochemical project in Nanjing, China. As such, the Ghia project, believe it or not, was carefully packed away - all the miscellaneous parts, for temperature controlled storage. We expect to be away from the U.S. for quite a while, so the project is on hold, indefinitely.

Here with are some pics of what was done most recently to the Ghia, before being placed in storage.

0 Comments:

Post a Comment

<< Home